Application of the Time Study Method to Analyze Discrepancies in Production Planning and Realization at PT XYZ
Keywords:
Time Study, Production Planning, Production Realization, TBC Downtime, Production Efficiency, Standard Time,, Aluminum IndustryAbstract
This study aims to analyze the incompatibility between the planning and realization of aluminum production at PT Indoaluminium Intikarsa Industri, especially in Time Between Coil (TBC) activities that have the potential to cause production delays. The research uses a quantitative approach with a case study method through observation, time study, interviews, and documentation of production data. The data was analyzed using cycle time calculations, normal time, and standard time. The results showed that TB downtime was the dominant factor causing production delays, with a compatibility rate between the standard time and the actual time of 90%–100%. These findings can be used as a basis for evaluation to improve production process efficiency and control of working time. Thus, the time study method has proven to be effective in identifying the sources of inefficiencies and supporting increased compatibility between planning and production realization.
Downloads
References
[1] P. Komarudin, M. Huda, and S. A. Arum, “Optimalisasi Proses Produksi Untuk Meningkatkan Efisiensi Operasional di Perusahaan Manufaktur (Study Manajemen Lean Manufacturing dalam Meningkatkan Efisiensi Perusahaan),” Jurnal Bisnis Net, vol. 8, no. 1, pp. 2621–3982, 2025.
[2] F. Masula, M. R. M. Huda, and A. Winarno, “Literature Review : Penerapan Perencanaan Produksi Dalam Meningkatkan Efektivitas dan Efisiensi Aktivitas Produksi,” Jurnal Ekonomi Bisnis dan Manajemen, vol. 2, no. 3, pp. 30–43, May 2024, doi: 10.59024/jise.v2i3.747.
[3] I. Kurniawan, T. Saraswati, and P. D. P. Ongkopratama, “Enhancing Production Planning and Inventory Control with a Web-Based System: A Case Study in an Indonesian Packaging Manufacturer Company,” Jurnal Teknik Industri, vol. 26, no. 1, pp. 105–126, Feb. 2025, doi: 10.22219/jtiumm.vol26.no1.105-126.
[4] D. Fitriani Selvia, R. Maulina, S. Azma Fadilah, and T. Desniat Rustanti, “Peningkatkan Efektivitas Produksi dan Optimalisasi Biaya Produksi,” Jurnal Manajemen dan Ilmu Administrasi, vol. 1, no. 1, pp. 71–77, 2025, doi: 10.58472/jmia.v1i1.38.
[5] D. Novianti, Maksudi, and S. Inten, “Rancang Bangun Sistem Production Planning and Inventory Control (PPIC) untuk Menentukan Estimated Time Departure (ETD) Pada PT Balagi Rattan Cirebon,” Jurnal Teknik Informatika, vol. 12, no. 02, pp. 44–53, 2020.
[6] M. A. Komara, R. A. Yusuf, A. Y. Salim, R. S. Wahyuni, and G. Heryana, “Rancang Bangun Sistem PPIC (Production Planning and Inventory Control) CV. Dea Ayu Lestari,” Journal of Applied Mechanical Technology, vol. 2, no. 1, pp. 42–50, Jul. 2023, doi: 10.31884/jamet.v2i1.28.
[7] N. Ratna Sari and A. Alfin, “Optimalisasi Rencana Produksi untuk Mengurangi Overstock dan Stockout di Divisi PPIC Menggunakan Random Forest,” Jurnal Pustaka AI (Pusat Akses Kajian Teknologi Artificial Intelligence), vol. 5, no. 2, pp. 149–165, Aug. 2025, doi: 10.55382/jurnalpustakaai.v5i2.1040.
[8] A. T. S. Giyoh, M. W. Manopo, and J. P. T. Makinggung, “Analisis Perencanaan dan Produksi Aktual dalam Menunjang Efisiensi Produksi Santan di PT. Sasa Inti Minahasa Selatan,” Jurnal Mahasiswa Manajemen, Administrasi & Kewirausahaan, vol. 1, no. 1, pp. 1–10, 2025.
[9] K. Gunawan, M. A. Akbar, and O. Hijuzaman, “Analisis Total Productive Maintenance (TPM) Dengan Menggunakan Metode Overall Equipment Effectiveness Pada Mesin Drayer Di PT. IJK.” Jurnal Teknologika (Jurnal Teknik-Logika-Matematika), vol. 14, no. 2, pp. 539–547, 2024, doi: 10.51132/teknologika.v14/2.
[10] Y. Supriyanti and W. A. Fahrudin, “Analisis efektivitas kinerja mesin dengan metode Total Productive Maintenance di PT. BII Analysis of machine performance effectiveness using the Total Productive Maintenance method at PT. BII,” Jurnal Terapan Teknik Industri, vol. 6, no. 2, pp. 252–260, 2025, doi: 10.37373/jenius.v6i2.
[11] M. A. Kartikasari, “Material Planning and Inventory Control in the Nutrition Service Unit at Ummi Hospital Bogor,” Jurnal Logistik Indonesia, vol. 8, no. 1, pp. 55–62, 2024, [Online]. Available: http://ojs.stiami.ac.id
[12] V. Zibade Mutiara and E. Halomoan Syah, “JURIT Jurnal Riset Ilmu Teknik Forecasting-Inventory Optimization Model: Integrating Exponential Smoothing with Min-Max and Blanket Order Systems,” JURIT: Jurnal Riset Ilmu Teknik, vol. 2, no. 3, pp. 187–197, 2024, doi: 10.59976/jurit.v1i1.140.
[13] Q. Zhou et al., “Furfural production from the lignocellulosic agro-forestry waste by solvolysis method – A technical review,” May 01, 2024, Elsevier B.V. doi: 10.1016/j.fuproc.2024.108063.
[14] R. Britania, A. Tjolleng, and S. Ardiana Putri, “Integrasi Model Inventori EOQ dan Time Series Forecasting untuk Sistem Inventori Optimal Integration of EOQ Inventory Model and Time Series Forecasting for Optimal Inventory System,” Jurnal Manajemen dan Bisnis, vol. 10, no. 1, pp. 78–94, 2024, [Online]. Available: https://ojs.unida.ac.id/Jvs,
[15] D. I. Purnamasari, V. A. Permadi, A. Saepudin, and R. P. Agusdin, “Demand Forecasting for Improved Inventory Management in Small and Medium-Sized Businesses,” Jurnal Nasional Pendidikan Teknik Informatika (JANAPATI), vol. 12, no. 1, pp. 56–66, Mar. 2023, doi: 10.23887/janapati.v12i1.57144.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jericho Agustino, Fahriza Nurul Azizah, Jeremi Jackson Tampubolon, Naufal Rabbani Sumitra

This work is licensed under a Creative Commons Attribution 4.0 International License.