[1]
J. Agustino, F. Nurul Azizah, J. Jackson Tampubolon, and N. Rabbani Sumitra, “Application of the Time Study Method to Analyze Discrepancies in Production Planning and Realization at PT XYZ”, MATRIK, vol. 27, no. 1, pp. 143–162, Sep. 2026.