Agustino, J. (2026) “Application of the Time Study Method to Analyze Discrepancies in Production Planning and Realization at PT XYZ”, Matrik : Jurnal Manajemen dan Teknik Industri Produksi, 27(1), pp. 143–162. Available at: https://journal.umg.ac.id/index.php/matriks/article/view/11690 (Accessed: 30 September 2026).