[1]
Agustino, J. et al. 2026. Application of the Time Study Method to Analyze Discrepancies in Production Planning and Realization at PT XYZ. Matrik : Jurnal Manajemen dan Teknik Industri Produksi. 27, 1 (Sep. 2026), 143–162.