Masnunah, S. (2018). OPTIMALISASI WAKTU PEKERJAAN PEMBANGUNAN PERUMAHAN GREEN HILL GRESIK MENGGUNAKAN METODE PERT DAN CPM. Jurnal Manajerial, 4(1), 55–68. https://doi.org/10.30587/jurnalmanajerial.v4i1.307