[1]
Rif’an, M. et al. 2021. ANALISIS PENDEKATAN LEAN SIX SIGMA UNTUK MEMINIMALISIR WASTE PADA PROSES PRODUKSI PIPA PVC (Studi Kasus: PT. XYZ). JUSTI (Jurnal Sistem dan Teknik Industri). 1, 3 (May 2021), 470–479. DOI:https://doi.org/10.30587/justicb.v1i3.2627.