EKO SAMSUDIN, Denni Aditama; ANDESTA, Deny; ISMIYAH, Elly.
ANALISIS BIAYA DAN WAKTU PROYEK PEMBANGUNAN PERUMAHAN CERME PRISMA LAND BLOK K MENGGUNAKAN METODE PERT DAN EVM (Studi Kasus: PT. Cahaya Prisma Utama).
JUSTI (Jurnal Sistem dan Teknik Industri), [S.l.], v. 2, n. 1, p. 83-93, nov. 2021.
ISSN 2746-0835.
Available at: <https://journal.umg.ac.id/index.php/justi/article/view/3187>. Date accessed: 25 nov. 2024.
doi: http://dx.doi.org/10.30587/justicb.v2i1.3187.