EKO SAMSUDIN, Denni Aditama; ANDESTA, Deny; ISMIYAH, Elly. ANALISIS BIAYA DAN WAKTU PROYEK PEMBANGUNAN PERUMAHAN CERME PRISMA LAND BLOK K MENGGUNAKAN METODE PERT DAN EVM (Studi Kasus: PT. Cahaya Prisma Utama). JUSTI (Jurnal Sistem dan Teknik Industri), [S.l.], v. 2, n. 1, p. 83-93, nov. 2021. ISSN 2746-0835. Available at: <https://journal.umg.ac.id/index.php/justi/article/view/3187>. Date accessed: 19 may 2024. doi: http://dx.doi.org/10.30587/justicb.v2i1.3187.