1.
Alfianidah R, Prafitasiwi AG. Analisis Risiko Penyebab Keterlambatan Pada Proyek Pembangunan Pondasi Silo Phase 3 Ø 24,50 M Menggunakan Metode FTA (Fault Tree Analysis). jtsl [Internet]. 2024 Aug. 1 [cited 2025 May 22];1(1):67-78. Available from: https://journal.umg.ac.id/index.php/jtsl/article/view/8210