[1]
Ramadhani, M.I. and Prafitasiwi, A.G. 2025. Analisis Percepatan Proyek Pembangunan Jalan Beton Tahap II Di Perumahan Citra Sari Regency Dengan Metode Time Cost Trade Off (TCTO). Jurnal Teknik Sipil dan Lingkungan. 2, 1 (Sep. 2025). DOI:https://doi.org/10.30587/jtsl.v2i1.10486.