Reinaldy, M. N. and Muhamadin, R. C. (2025) “ANALISIS PERAWATAN UNIT SLAG HAULER P-240 CTE DI PT. XYZ”, ENIGMA: Engineering in Green Machinery, 2(1), pp. 43–50. doi: 10.30587/enigma.v2i1.10502.